ADU · Orange
Attached ADU, Orange
An attached ADU in Orange that reads as a seamless extension of the main house — shared wall, independent entrance, and a full kitchen and bath inside a footprint that preserved the backyard.
- ProjectAttached ADU
- CityOrange, CA
- BuilderAvorino · Lic. #1107538
- Typical budget$200K–$350K+ (attached ADU)
- Typical timeline5–8+ months build, after design + permits
- Warranty1-yr fit & finish · 4-yr systems · 10-yr structural

Scope of work
What this build involved.
- Attached ADU sharing one wall with the main residence
- Independent entrance + address-ready separation
- Full kitchen and bath
- Sound-isolation detailing at the shared wall
- Roofline + exterior finish matched to the main house
Gallery
Finish + structural detail.
Permits & process
Orange applies design review in its historic quarters (Old Towne runs a dedicated review board), but standard residential lots follow the regular plan-check path. Matching the existing structure's exterior kept review friction low.
The build
Attached units trim the site-work bill — one shared wall, shorter utility runs — which is why they anchor the value end of the full-size ADU range.
Next step
Want a written estimate for your Orange project?