Two-Story Detached ADU · Santa Ana HillsDesign-build in Orange County
One roof, from first sketch to the final walkthrough.
Design and construction handled under one team, one contract — no need to hire a separate architect and builder. One number, one timeline, one company that owns the outcome.
Why design-build wins
Design and construction, drawn at the same table.
In the traditional model you hire an architect, get drawings, then bid them to contractors — and find out months in whether the design was ever buildable on budget. Design-build collapses that gap: the people who'll build it help shape it from day one.
- One contract, one company — design and construction under the same roof, accountable for both.
- We price the design as it's drawn, so the budget is real before you ever approve a set of plans.
- Overlapping phases — permitting and long-lead orders begin while the design is still being refined.
- A single point of responsibility from concept to final inspection. No finger-pointing, no playing project manager.

Design-build vs. design-bid-build (6)
The same project, two very different experiences.
“Design-bid-build” is the traditional, sequential path: design it, bid it, then build it — with you in the middle. Here's how the two stack up on the things that actually decide how a project goes.
| Design-Build (Avorino) | Design-Bid-Build (traditional) | |
|---|---|---|
| 01Contracts | Design-Build (Avorino)One contract, one roof for design + build. | Design-Bid-Build (traditional)Separate contracts with an architect and a contractor. |
| 02Accountability | Design-Build (Avorino)Single point of responsibility — we own the result. | Design-Bid-Build (traditional)Split — if something's wrong, the parties point at each other. |
| 03Budget | Design-Build (Avorino)Priced as it's designed; locked before we break ground. | Design-Bid-Build (traditional)Unknown until the bids come back — often over. |
| 04Timeline | Design-Build (Avorino)Phases overlap — studies show up to ~30% faster delivery. | Design-Bid-Build (traditional)Strictly sequential: design, then bid, then build. |
| 05Change orders | Design-Build (Avorino)Fewer — industry data shows ~6% fewer change orders. | Design-Bid-Build (traditional)More, from gaps between what's drawn and what's buildable. |
| 06Your role | Design-Build (Avorino)One point of contact. You make decisions, not phone calls. | Design-Bid-Build (traditional)You're the middleman between architect and builder. |
Designed and built by Avorino · Garden Grove
Watch it come together.
A time-lapse visualization of the detached ADU build, from excavation to the finished exterior.

- 01 / 04FoundationWe set it in the ground.
- 02 / 04FramingThe structure rises.
- 03 / 04RoofIt takes its shape.
- 04 / 04FinishedYou get the keys.
Designed and built by Avorino · Detached ADU, Garden Grove
From an empty backyard to a finished ADU.
One design-build project, followed on site from the backyard before to the finished home.
The backyard before.


Designed and built by Avorino · Detached ADU, Garden Grove
From an empty backyard to a finished ADU.
One design-build project, followed on site from the backyard before to the finished home.
01 / 07Before
The backyard before.
02 / 07Excavation
The excavation.
03 / 07Blueprint
It starts as a drawing. The plans, marked up on site. Design and build under one roof.
04 / 07The pour
The pour.
05 / 07Framing
The framing.
06 / 07Roof on
The roof on.
07 / 07The kitchen
The finished kitchen.

Designed and built. Finished.
The finished exterior, with its gabled entry porch · the same build
Explore our workHow an Avorino design-build runs
From a first conversation to your keys.
Every phase is handled in-house, so nothing gets lost in translation between the people who designed it and the people who build it.


01 / 06
Discovery & feasibility
We sit down with your goals, your site, and your budget — then pressure-test what's actually buildable here: zoning, setbacks, utilities, and the real cost range before anyone draws a line.
02 / 06
Design & engineering
Architecture, structural engineering, and Title 24 are developed together, in-house. You see your home take shape while a builder keeps every choice grounded in what it costs and how it's built.
03 / 06
Pre-construction & budget
We value-engineer the set, lock allowances, and hand you a fixed, line-item budget and schedule. This is where design-build earns its keep — no surprise bids, no scramble after approval.
04 / 06
Permitting & plan-check
We submit, answer plan-check corrections, and shepherd approvals city by city across Orange County — while long-lead materials are already on order, so the calendar never stalls waiting on a stamp.
05 / 06
Construction
We build what we designed. Dedicated project management, a clean site, weekly updates, and finish-level craftsmanship — with the original budget as the reference, not a memory.
06 / 06
Finish & handover
Final inspections, a punch-list walked down to zero, and a careful handover with your warranty and care guide. You get the keys to a home that matches the renderings you approved.
What is design-build, and why does it matter in Orange County?
Design-build puts architecture, engineering, permitting, and construction under one contract and one accountable team, instead of hiring an architect and a general contractor separately and refereeing between them. Budget shapes the design from day one, the bid can’t blow up after approval, and one Avorino team carries the project from feasibility to keys. Industry research (DBIA) shows design-build projects average roughly 3.8% less cost growth and about 6% fewer change orders. License #1107538.
Start your projectIndustry research (DBIA)
- less cost growth than design-bid-build
- ~3.8%
- fewer change orders
- ~6%
- 01Discovery & feasibility
- 02Design & engineering
- 03Pre-construction & budget
- 04Permitting & plan-check
- 05Construction
- 06Finish & handover
What we design-build (6)
One delivery model, the full range of projects.
Whether it's a ground-up estate or a back-yard ADU, the same one-team model carries it from concept to keys.

01 Custom homes
Custom homes built as a knock-down and rebuild on the lot you own, designed with our engineer and architect partners or built from your plans.
Custom homes02 ADUs
Detached, attached, Junior ADU, and garage-conversion accessory units — design, permits, and build in-house.
ADUs03 Additions
Second stories and room extensions that read like they were always part of the house.
Additions04 Whole-home renovations
Full-home and kitchen/bath remodels with luxury finish and a budget that holds.
Whole-home renovations05 Commercial / tenant improvement
Tenant improvements and commercial buildouts delivered on one accountable contract.
Commercial / tenant improvement06 3D rendering
See it photoreal before we build it — visualization baked into the design phase.
3D renderingRecent work
Designed and built by Avorino, across Orange County.
Custom homes, ADUs, and renovations across Orange County — designed, permitted, and built in-house. Tap any project to see the full set.
01 / What design-build is
What is design-build?
Design-build is a project-delivery method where one company handles both the design (architecture and engineering) and the construction under a single contract. Instead of hiring an architect and a contractor separately and managing the handoff yourself, you work with one point of accountability from the first concept through the final walkthrough.
What's the difference between design-build and design-bid-build?
Design-bid-build is the traditional, sequential path — you design a project fully, put it out to bid, then build it. Design-build overlaps those phases under one roof and one contract. The payoff is a budget that's known before you break ground, faster timelines, fewer change orders, and a single point of responsibility instead of an architect and a builder pointing at each other.
02 / Cost and time
Is design-build cheaper than hiring an architect and a contractor separately?
It's usually more predictable, which is what saves money. Because a builder prices the design as it's drawn, you avoid the classic surprise where bids come back over budget after months of design. Industry research (DBIA) shows design-build projects average roughly 3.8% less cost growth and about 6% fewer change orders than design-bid-build.
Is design-build faster?
Yes — typically meaningfully faster, because design and construction overlap instead of running back-to-back. Permitting and long-lead material orders can begin while the design is being finalized. Studies have measured design-build delivering on a substantially faster schedule than the traditional design-bid-build path.
03 / Working with Avorino
Is Avorino a licensed design-build company?
Yes. Avorino is a fully licensed Orange County design-build company (California State License Board #1107538) carrying architecture, structural engineering, Title 24, permitting, and construction in-house — a single point of accountability from first sketch to final inspection.
What kinds of projects can you design-build?
Custom homes, ADUs, additions and second stories, whole-home and kitchen/bath renovations, and commercial tenant improvements — across all of Orange County. The same one-team model carries each from concept to keys.
Start your project
Tell us what you're building.
Share your project and your property — we'll come back with a feasibility read, a realistic budget range, and the next step. One team, one number, one timeline.

- 01Project
- 02Plans
- 03Context
- 04Contact
Service areas
Serving 37 Orange County cities & communities, plus unincorporated OC and nearby LA County.
- Aliso Viejo
- Anaheim
- Brea
- Buena Park
- Corona del Mar
- Costa Mesa
- Coto de Caza
- Cypress
- Dana Point
- Fountain Valley
- Fullerton
- Garden Grove
- Huntington Beach
- Irvine
- La Habra
- La Palma
- Ladera Ranch
- Laguna Beach
- Laguna Hills
- Laguna Niguel
- Lake Forest
- Las Flores
- Los Alamitos
- Mission Viejo
- Newport Beach
- Orange
- Placentia
- Rancho Santa Margarita
- Rossmoor
- San Clemente
- San Juan Capistrano
- Santa Ana
- Stanton
- Tustin
- Villa Park
- Westminster
- Yorba Linda
- Unincorporated Orange County
- Unincorporated LA County