Walkthrough + scope
We meet at the house. Goals, constraints, the version worth the disruption.

Renovations · Avorino
Kitchens, baths, primary suites, gut remodels. Same Avorino, same finish standards, same line-item proposal we'd give a friend.

8–14+ wk
Layout reworks, cabinetry, countertops, appliances, lighting.
5–8+ wk
Plumbing reroute, tile, vanity, fixtures, lighting.
4–9+ mo
Multi-room renovations carried as one project, one schedule, one change-order log.
6–12+ mo
Strip to studs, modernize mechanical, electrical, and plumbing, rebuild to current code.
5–10+ mo
Keep what's worth keeping, rebuild what isn't. Era-correct finishes.
Avorino runs renovations with the design-build discipline we apply to ground-up custom work. Same Avorino, same drawings, same single point of accountability — under one roof.
Avorino actively involves clients throughout. Scroll through walkthrough, drawings, permits, construction, and punch — the wireframe behind the copy swaps per phase.
We meet at the house. Goals, constraints, the version worth the disruption.
A few lines about scope is enough. Avorino will read it and write back as soon as possible with cost range, realistic schedule, and the structural quirks your home in particular tends to surface mid-project.
Direct line
Prefer a phone call?
A whole-home renovation typically runs 4–9+ months from demo to final punch, depending on scope. Kitchen-only is 8–14+ weeks, primary-bath or single-room is 5–8+ weeks. Avorino sequences custom-cabinet (14–18+ week lead) and structural work in parallel so the site never waits on a single trade.
Service areas