// Garden Grove

ADU Construction in Garden Grove

Most affordable ADU market entry in Orange County, pre-approved "ADU Go" program for faster permitting, low vacancy rates (~5%), and strong blue-collar rental demand near major employment centers.

Garden Grove is one of the most affordable cities in Orange County for ADU investment, with a population of over 170,000 residents. The city launched its "ADU Go" pre-approved program, offering homeowners a streamlined path to ADU construction with pre-reviewed plans that significantly reduce permitting time. Garden Grove maintains low vacancy rates of approximately 5%, driven by strong blue-collar rental demand and diverse neighborhoods including Midway City and West Garden Grove. Its proximity to Disneyland employment and the broader Anaheim tourism economy provides a steady pipeline of renters seeking affordable housing options in a county where median rents continue to climb.

Zoning & requirements

Setbacks
4-foot minimum from rear and side property lines for new detached ADUs. Conversions of existing structures are exempt from setback requirements.
Height
16 feet for single-story detached ADUs. Up to 17 feet may be permitted to accommodate roof pitch on certain lot configurations.
Parking
One parking space per ADU required. Exemptions available for properties within 0.5 miles of public transit, garage conversions, and other state-mandated conditions.
Lot Size
5,000–7,000 sqft typical residential lots. Some R-1 zones have larger lots ranging from 11,000–15,000 sqft, providing ample space for detached ADUs.
Owner Occupancy
No owner-occupancy requirement (permanent per AB 976).
Additional Notes
Minimum 6-foot building separation required between the ADU and the primary dwelling. The "ADU Go" pre-approved program offers pre-reviewed plans that can reduce plan check time significantly. Impact fees waived for ADUs under 750 sqft.

How to permit your ADU in Garden Grove

01

Check ADU Go eligibility

Contact the Building and Safety Division to determine if your property qualifies for the "ADU Go" pre-approved ADU program. Pre-approved plans can reduce your permitting timeline by several weeks.

02

Verify lot & zoning

Confirm your lot size, zoning classification, and setback dimensions. Measure the 6-foot building separation from your primary dwelling. Check utility connections and easement locations.

03

Design or select plans

Choose from ADU Go pre-approved plans or create custom architectural plans. Custom plans must include site plan, floor plan, elevations, structural, MEP, and Title 24 energy calculations.

04

Submit to Building and Safety

Submit your plans to the Building and Safety Division. Pre-approved ADU Go plans receive expedited review. Custom plans follow the standard 60-day state-mandated review timeline.

05

Obtain permit & build

Once approved, pull your building permit and begin construction. Schedule required inspections at each milestone — foundation, framing, rough MEP, insulation, and final.

06

Final inspection & occupancy

Request final inspection from the Building and Safety Division. Once passed, you receive your Certificate of Occupancy and your ADU is legal to occupy or rent.

Garden Grove Building and Safety Division • Fees: $5,000–$10,000 total (plan check, building permit, school fees). Impact fees waived for ADUs under 750 sqft. ADU Go plans may have reduced plan check fees. • Timeline: 4–8 weeks for standard plan check. ADU Go pre-approved plans may be processed faster. 60-day maximum review required by state law.

Get your Garden Grove ADU estimate