Phase 01 · Survey

Walk the lot first.

Soils, slope, setbacks, neighbor friction. We flag what's hard before drawings start, not during permitting.

  1. 01Survey
  2. 02Engineering
  3. 03Permits
  4. 04Construction kickoff
  5. 05Inspection
  6. 06Project Completion
  1. Entry custom

    $900K – $1.6M+

    Single-family ground-up on a flat lot. Standard finishes, 2,500-ish square feet, modest engineering.

  2. Mid-tier custom

    $1.5M – $3.2M+

    3,500–4,500 sqft, premium finishes, hillside or coastal-adjacent lots, more substantial structural work.

  3. High-end custom

    $2.5M – $5.5M+

    Hillside engineering, complex programs, premium finish carpentry, full design-build coordination.

  4. Estate

    $5.5M+

    Multi-wing residences, motor courts, guest houses, premium materials and bespoke detailing throughout.

Inside the build

Engineering, permits, construction — end-to-end.

New builds for landowners. Avorino integrates design and construction into a single discipline — site preparation through turnkey delivery. Real-time cost visibility every step of the way.

  • Site preparation, grading, and feasibility carried in-house
  • Architecture + structural engineering integrated from day one
  • City permits and plan-check corrections managed by Avorino
  • Single point of accountability from your vision to certificate of occupancy
What we build

Ground-up residential, end-to-end.

01/06

01

Site prep + grading

Clearing, rough grade, pad cut, drainage. We start from a survey and finish with a pad ready for foundation.

  • Grading & compaction
  • Erosion control
  • Underground utilities
  1. Plan on twelve-to-eighteen+ months from permit submittal to certificate of occupancy on a single-family build, longer for a complex site. The variance is permitting, not construction — we tell you on day one which side of that range your vision lives on.

Tell us about the project.

Where are you in the process?

Land status

Direct line

Show us your vision. We'll tell you what it'll cost to build.

How much does new construction cost in Orange County, and how long does it take?

Ground-up new construction in Orange County typically starts at $900K–$1.6M+ for an entry custom home on a flat lot and runs to $5.5M+ for estate-scale builds. Plan on 12–18+ months from permit submittal to certificate of occupancy — the variance is permitting, not construction. Avorino carries the full build design-build, on one contract, License #1107538.

Orange County ground-up custom-home budget tiers
TierTypical budgetWhat it covers
Entry custom$900K – $1.6M+Single-family ground-up on a flat lot. Standard finishes, 2,500-ish square feet, modest engineering.
Mid-tier custom$1.5M – $3.2M+3,500–4,500 sqft, premium finishes, hillside or coastal-adjacent lots, more substantial structural work.
High-end custom$2.5M – $5.5M+Hillside engineering, complex programs, premium finish carpentry, full design-build coordination.
Estate$5.5M+Multi-wing residences, motor courts, guest houses, premium materials and bespoke detailing throughout.
Talk To UsFree estimate. Same-week free consultation.General-B License #1107538 · 7+ years of Orange County experience