Skip to main content
Avorino
The entry pergola of the finished Santa Ana new construction, built by Avorino
The finished kitchen of the Santa Ana new construction, built by Avorino

New Construction · Avorino

Orange County, California

New construction in Orange County

From your vision to move-in keys.

Site prep, engineering, permitting, vertical construction — every phase under one roof. Orange County land owners trust us to carry the work from a survey stake to a finished house.

01 / New Construction37 Orange County cities & communities · B-#1107538Scroll to explore ↓

Inside the build

Engineering, permits, construction — end-to-end.

New builds for landowners. Avorino integrates design and construction into a single discipline — site preparation through turnkey delivery. Real-time cost visibility every step of the way.

  • Site preparation, grading, and feasibility carried in-house
  • Architecture + structural engineering integrated from day one
  • City permits and plan-check corrections managed by Avorino
  • Single point of accountability from your vision to certificate of occupancy
The finished kitchen of the Santa Ana new construction, built by Avorino

What we build (6)

Ground-up residential, end-to-end.

Show us your vision. We'll tell you what it'll cost to build.
AVORINO / SPATIAL STUDIESFIG. 01
Site prep + gradingConcept only · cutaway walls lowered to reveal the layout

01 Site prep + grading

Clearing, rough grade, pad cut, drainage. We start from a survey and finish with a pad ready for foundation.

  • Grading & compaction
  • Erosion control
  • Underground utilities

02 Foundation + structural

Footings, slab or stem-wall, framing — engineered to your soils report and the load you're carrying overhead.

  • Engineering coordination
  • Slab or stem-wall
  • Framing inspection

03 Vertical construction

Walls, roof, sheathing, weather barrier — the dry-in moment is when the project pivots from contingency to certainty.

  • Framing & sheathing
  • Roofing
  • Weather-tight envelope

04 Mechanical, electrical, plumbing

mechanical, electrical, and plumbing rough-in routed to fit your finish plan, not the other way around. Trim sizes and wall depths get the design they earn.

  • mechanical, electrical, and plumbing rough + trim
  • Title 24 mechanical
  • Inspection sequencing

05 Interior finishes

Cabinetry, stone, tile, paint. Every selection log gets a written allowance against it; surprises are how trust dies.

  • Selection allowances
  • Trade coordination
  • Punch list management

06 Final walk + handover

Final inspection, punch close-out, certificate of occupancy, owner walk-through. We hand you a binder, not a phone number.

  • Certificate of Occupancy + handover
  • Warranty binder
  • Tiered warranty

Built by Avorino · Santa Ana

Watch it come together.

A time-lapse visualization of the Santa Ana build, from the cleared lot to the finished exterior.

Time-lapse visualization of an Avorino new construction in Santa Ana, from the cleared lot to the finished exterior
  1. 01 / 04The lotThe walled lot, cleared.
  2. 02 / 04The slabThe slab poured between the walls.
  3. 03 / 04The frameWalls and roof framing rise from the slab.
  4. 04 / 04FinishedThe finished exterior, with its entry pergola.

Built by Avorino · Santa Ana

From a walled lot to a finished house.

One ground-up build in Santa Ana, an ADU and a main house, followed on site from the cleared lot to the floors being prepared.

01 / 08The lot

The walled lot, cleared.

The walled lot, cleared. New construction in Santa Ana, built by Avorino.
Site record · site photos and our Instagram storyFrame 01 of 08
The finished living room, open to the kitchen, in the new construction in Santa Ana, built by Avorino.

Built by Avorino · Santa Ana

From a walled lot to a finished house.

One ground-up build in Santa Ana, an ADU and a main house, followed on site from the cleared lot to the floors being prepared.

  1. The walled lot, cleared. New construction in Santa Ana, built by Avorino.
    01 / 08

    The lot

    The walled lot, cleared.

  2. Plumbing laid in the footing trenches. New construction in Santa Ana, built by Avorino.
    02 / 08

    Plumbing

    Plumbing laid in the footing trenches.

  3. Footing forms and rebar set for the pour. New construction in Santa Ana, built by Avorino.
    03 / 08

    Forms and rebar

    Footing forms and rebar set for the pour.

  4. The slab poured. New construction in Santa Ana, built by Avorino.
    04 / 08

    The slab

    The slab poured.

  5. The framing up. New construction in Santa Ana, built by Avorino.
    05 / 08

    Framing

    The framing up.

  6. The walls sheathed. New construction in Santa Ana, built by Avorino.
    06 / 08

    Sheathed

    The walls sheathed.

  7. The ceiling insulated between the joists, with the rough-in runs in place. New construction in Santa Ana, built by Avorino.
    07 / 08

    Rough-in

    The ceiling insulated between the joists, with the rough-in runs in place.

  8. Waterproofing going down on the subfloor, the walls painted and the doors hung. New construction in Santa Ana, built by Avorino.
    08 / 08

    Floor prep

    Waterproofing going down on the subfloor, the walls painted and the doors hung.

The finished living room, open to the kitchen, in the new construction in Santa Ana, built by Avorino.

Finished.

The finished living room and kitchen · the same build

Explore our work

Survey · Engineering · Permits · Construction kickoff · Inspection · Project Completion

From vision to keys

  1. Phase 01 · Survey

    Walk the lot first.

    Soils, slope, setbacks, neighbor friction. We flag what's hard before drawings start, not during permitting.

  2. Phase 02 · Engineering

    Drawings built to clear plan check.

    Architect coordination, structural engineering, and soils when the lot calls for it — prepared to keep city-comment cycles short.

  3. Phase 03 · Permits

    We handle city submittal.

    We take care of the submission, comments, and resubmittal to the city. You sign once; we carry it all.

  4. Phase 04 · Construction kickoff

    Construction officially begins.

    We prepare the site, confirm the plan, and begin the first phase of work.

  5. Phase 05 · Inspection

    Inspector Ready, Project Steady.

    We schedule the required inspections, meet with the city inspector, and address any corrections needed to keep the project moving.

  6. Phase 06 · Project Completion

    Finished, Polished, Delivered.

    Final work is wrapped up, the site is cleaned, and we walk through the finished project with you.

Process

From survey to certificate of occupancy.

AVORINO / SPATIAL STUDIESFIG. 01
Spatial planning · room relationships and circulationConcept only · cutaway walls lowered to reveal the layout
One conceptual floor plan, developed through every phase. Schematic, not an engineering detail.
Crafted to fit. Built to last.

01 / 06

Free consultation

We meet you on the lot. Soils, slope, setbacks, neighbor friction — flagged before drawings start, not discovered during permitting.

How much does new construction cost in Orange County, and how long does it take?

Ground-up new construction in Orange County typically starts at $900K–$1.6M+ for an entry custom home on a flat lot and runs to $5.5M+ for estate-scale builds. Plan on 12–18+ months from permit submittal to certificate of occupancy — the variance is permitting, not construction. Avorino carries the full build design-build, on one contract, License #1107538.

Schedule a Site Visit

Cost and timeline

entry custom home, flat lot
$900K–$1.6M+
estate-scale builds
$5.5M+
permit submittal to certificate of occupancy
12–18+ months
The six phases of an Avorino new construction build in Orange County
  1. 01Free consultation
  2. 02Architecture + engineering
  3. 03Permits + plan check
  4. 04Site prep + foundation
  5. 05Framing → finishes
  6. 06Walk + warranty

Budget ranges

Where your project lands.

OC ground-up custom-home cost ranges by program. We tell you on the first call which range your project will land in — and what specifically would push it to the next.

  1. $900K – $1.6M+

    Entry custom

    Single-family ground-up on a flat lot. Standard finishes, 2,500-ish square feet, modest engineering.

  2. $1.5M – $3.2M+

    Mid-tier custom

    3,500–4,500 sqft, premium finishes, hillside or coastal-adjacent lots, more substantial structural work.

  3. $2.5M – $5.5M+

    High-end custom

    Hillside engineering, complex programs, premium finish carpentry, full design-build coordination.

  4. $5.5M+

    Estate

    Multi-wing residences, motor courts, guest houses, premium materials and bespoke detailing throughout.

Ground-up builds

Recent Avorino new construction.

  • The finished exterior, with its entry pergola, of the Santa Ana new construction built by Avorino
    ExteriorSanta Ana
  • The finished kitchen in the Santa Ana new construction built by Avorino
    KitchenSanta Ana
  • A finished bedroom in the Santa Ana new construction built by Avorino
    BedroomSanta Ana
  • The finished bath in the Santa Ana new construction built by Avorino
    BathSanta Ana

See more on Instagram @avorinoconstruction

01 / Time and budget

How long does ground-up actually take in Orange County?

Plan on twelve-to-eighteen+ months from permit submittal to certificate of occupancy on a single-family build, longer for a complex site. The variance is permitting, not construction — we tell you on day one which side of that range your vision lives on.

Will the bid hold through a long schedule?

We carry escalation as a written allowance. Material movements get tracked monthly; if a category is going to land outside the allowance, you hear it before the trade starts, not at billing.

02 / Working with Avorino

What if I haven't picked an architect?

We can work with your architect, or we can handle the project through our design-build process. Either way, design and construction stay aligned from day one, so decisions are guided by real budget, schedule, and buildability.

Can you handle the engineering, soils, and survey work?

We coordinate the engineer of record, soils engineer, and surveyor. You see one project schedule and one point of accountability.

What's your role after move-in?

Final walkthrough plus the tiered warranty — 1-year fit & finish, 4-year systems, 10-year structural — with the same Avorino team on the phone. Most ground-up clients call us once or twice in the first year, then we talk again when they're ready for the next project.

New Construction · Avorino

Show us your vision. We'll tell you what it'll cost to build.

Site visit + written estimate on cost, schedule, and what your specific vision will throw at the project. No obligation; the estimate is yours either way.

AVORINO / SPATIAL STUDIESFIG. 01
Handover concept · the finished, furnished homeConcept only · cutaway walls lowered to reveal the layout
Designed concept · not your final plan
  1. 01Project
  2. 02Plans
  3. 03Context
  4. 04Contact

Where are you in the process?

Land status
Talk To UsFree estimate. Same-week free consultation.General-B License #1107538 · 7+ years of Orange County experience