Custom home builder in San Diego.
Avorino designs and builds custom homes and rebuilds across San Diego County. We are a licensed general building contractor, CSLB #1107538, based in Tustin, Orange County. Partner architects and engineers design your home with you, or we build from your own plans.
Pictured: the great room of a pool house Avorino built in San Juan Capistrano, Orange County.
Before you plan
Every lot answers to its city or county.
This page is general. Zoning, setbacks, height limits and permit criteria are set by the city or county where your lot sits, so check with them about your lot.
Check our license on the CSLB website. (opens in a new tab)
Photographs: the great room of a pool house Avorino built in San Juan Capistrano and the living room of a home Avorino built in Aliso Viejo. Both are Orange County projects.

Where we build
Where in San Diego County do you build?
Avorino takes custom home projects across San Diego County, on the lot you own or the lot you are about to buy.
Areas we take projects in
- La Jolla
- Del Mar
- Rancho Santa Fe
- Solana Beach
- Encinitas
- Carlsbad
- Point Loma
- Coronado
- North County San Diego
Avorino is based in Tustin, in Orange County. These are places where we take custom home projects, not a list of past work. Tell us your address in the consultation and we will confirm we can build there.
One team (4)
Design, permits and construction with one builder.
You deal with Avorino from the first sketch to the final inspection, instead of passing your project between an architect, an expediter and a contractor.

01 Design-build
Our engineer and architect partners design the home with you, and Avorino builds it. Design and construction run through one company.
02 Your own plans
Already working with an architect? Avorino builds from a client's own plans.
03 Permits through one office
Structural engineering and Title 24 energy calculations are coordinated through Avorino. For signed clients, Avorino submits the plans for plan check and follows them through.
04 Help before you buy land
Looking at a lot to buy? Talk to us before you close. We review the lot with you. The city or county sets the requirements for the home you have in mind, and we go through them with you.
How we build · Orange County
How a home goes up once the lot is clear.
A pool house Avorino built from the ground up in San Juan Capistrano, in Orange County, followed on site from the cleared lot to the finished room. It is Orange County work, shown here to explain the order a new home goes up in.
A cleared, staked lot, ready for the foundation.


How we build · Orange County
How a home goes up once the lot is clear.
A pool house Avorino built from the ground up in San Juan Capistrano, in Orange County, followed on site from the cleared lot to the finished room. It is Orange County work, shown here to explain the order a new home goes up in.
01 / 08The lot
A cleared, staked lot, ready for the foundation.
02 / 08Rebar and plumbing
Slab reinforcement and plumbing set before the pour.
03 / 08The slab
Concrete poured, with sill plates and utility stubs in place.
04 / 08Walls framed
Wall framing stood up on the slab.
05 / 08The roof structure
Rafters and ridge set over the main room.
06 / 08Sheathed
Walls sheathed, with large openings for the glass doors.
07 / 08Rough-in
Wiring and plumbing run through the open stud walls.
08 / 08Inside
Drywall up and the sliding glass doors installed.

The pool house, finished.
The finished great room, furnished for the photograph · Orange County
Explore our workThe process
From sketch to keys.
Six phases, from the first conversation to the owner walk-through and the warranty.

Permits and rules
What do permits and rules look like in San Diego County?
It depends on where your lot sits. The City of San Diego, the unincorporated County and each of the other cities in the County run their own departments. The points below are general, and each is linked to the official page it comes from.
Rules change. Confirm the current requirement for your lot with the city or county before you plan.
City of San Diego
Development Services.
The Development Services Department issues building permits. A building permit is required to construct any new structure, and a single-family home uses the Combination Building permit type, with a geotechnical report submitted when required. The City reviews the plans for compliance with the regulations that apply.
Older buildings on the lot.
If the site has a structure 45 years old or more, a historic review can apply. Ask the City about this before you plan a rebuild.
The Coastal Height Limit Overlay Zone.
Within the Coastal Zone of the City of San Diego, no building or addition may exceed thirty feet in height. The limit is the City's codification of Proposition D, effective December 7, 1972, and the base of measurement for height follows the Uniform Building Code of 1970. The zone runs from the northern city limits to the Mexican border and inland to Interstate 5 as it was on January 1, 1971, with a few listed areas exempt. Check the current code for your lot.
Coastal Development Permits.
The City issues a Coastal Development Permit for coastal development in the Coastal Overlay Zone, unless the development is exempt. A site entirely inside the Coastal Commission's permit jurisdiction or the Deferred Certification Area gets its permit or exemption from the Commission instead, and a site partly inside needs a permit from each agency for its part. The City's process is written to be consistent with the Local Coastal Program and the California Coastal Act, and its decision can be appealed to the Planning Commission.
La Jolla Shores.
In the La Jolla Shores Planned District, a Planned District Permit is needed before work on any new building. A Hearing Officer decides it under Process Three, after the La Jolla Shores Advisory Board gives written recommendations or comments. The City Manager can treat some projects as minor and decide them under Process One without that step. The district exists to protect the area's ocean-oriented setting, architectural character and natural terrain, and it sets its own height and floor-area rules, so read the current code. Within the Coastal Zone, a lot with slopes of 25 percent or greater needs extra environmental information.
Fire hazard zones and brush management.
If any part of a lot falls inside the City's Very High Fire Hazard Severity Zone, the state's wildland-urban interface building standards apply to new buildings and additions. Brush management applies to the vegetation around a structure, and for new development it is addressed in a site-specific plan. San Diego Fire-Rescue also says its Zone 0 requirement applies to new structures built in Very High Fire Severity Zones after February 28, 2026.
Sources (9)
- City of San Diego, building permits (opens in a new tab)
- San Diego Municipal Code, Coastal Height Limit Overlay Zone (opens in a new tab)
- San Diego Municipal Code, Coastal Development Permits (opens in a new tab)
- San Diego Municipal Code, La Jolla Shores Planned District permits (opens in a new tab)
- San Diego Municipal Code, La Jolla Shores Planned District purpose (opens in a new tab)
- San Diego Municipal Code, La Jolla Shores Planned District zones (opens in a new tab)
- City of San Diego, Fire Hazard Severity Zone FAQ (opens in a new tab)
- San Diego Municipal Code, brush management (opens in a new tab)
- San Diego Fire-Rescue, defensible space for property owners (opens in a new tab)
Unincorporated San Diego County
Planning and Development Services.
In unincorporated areas, the Building Services Division of Planning and Development Services issues building permits for residential and commercial structures. Plans are reviewed against California building standards, county amendments, the Grading Ordinance, the Zoning Ordinance, the Consolidated Fire Code and the Consolidated Wildland-Urban Interface Code.
Conditions of approval.
Each permit record gets Conditions of Approval. The county lists Fire District Approval, Flood Control, Septic Review and Driveway Review as examples of conditions that may take longer.
High fire areas.
The county says it requires special features for projects in high-risk areas. It publishes its own Wildland-Urban Interface Code, which includes county amendments to the 2025 California code, so check the county's current version for your lot.
Septic on rural lots.
A lot that is not served by a sewer system uses an onsite wastewater (septic) system. The Department of Environmental Health and Quality reviews the design of new systems and inspects the installation. On a steep site, the septic layout comes with a slope stability report or statement from a licensed civil engineer or geologist.
Cities of their own.
Del Mar, Solana Beach, Encinitas, Carlsbad and Coronado are cities of their own, and La Jolla and Point Loma are communities of the City of San Diego. A lot there answers to that city. Rancho Santa Fe is an unincorporated community, so a lot there answers to the County. Check with the city or county where your lot sits.
State of California
The Energy Code.
A building permit application filed on or after January 1, 2026 follows the 2025 Energy Code. For single-family homes it encourages heat pumps for heating, cooling and water heating, and it does not mandate a fuel type.
CALGreen.
The 2025 California Green Building Standards Code, Part 11 of Title 24, took effect January 1, 2026.
Wildland-urban interface standards.
The state's wildland-urban interface building standards apply to new buildings in State Responsibility Areas and on land that a city or other local agency designates a High or Very High Fire Hazard Severity Zone. They are written to resist flames and burning embers. The required vegetation management must be in place before final approval of the building permit, and local jurisdictions can amend the code, so ask your building official.
Cost
What shapes the cost of a custom home in San Diego County?
The lot, the size and finish of the home, and what your city or county asks of the design. Avorino prices custom homes cost-plus, so the final cost can land above or below the estimate.
- The lot. Slope, soil, access and utilities change the foundation, the grading and the site work. A lot without a sewer connection uses a septic system, and a steep one can need a slope stability report.
- Size and finishes. Square footage, structure and the level of finish drive most of the cost of construction.
- Rules and review. Coastal review, a height limit, fire-zone construction standards and a planned district's own permit can add design work, reports and review time.
- Plans or no plans. With your own plans, Avorino builds to them. Without plans, you pay for the design and plans first, and then the build is priced cost-plus.
We give a number after we have seen your lot and your plans. The consultation is where we start.
How the work is priced
Fixed price or cost-plus, depending on the project.
ADUs and residential remodels have a fixed price, given before work starts. Custom homes, new construction and commercial work are cost-plus. Design-build is how the work is delivered under either one.
| Price model | With your plans | No plans yet (design-build) |
|---|---|---|
| Cost-plusCustom homes, new construction and commercial work | Avorino builds to your plans and gives you an estimate, not a fixed price. You pay the cost of the work plus an agreed fee, so the final cost can land above or below the estimate. | Avorino designs and builds. You pay for the design and plans, then the build is priced cost-plus. A custom home is usually design-build plus cost-plus. |
| Fixed priceADUs and residential remodels | Avorino builds to your plans at a fixed price, given before work starts. It is a price, not an estimate. | Avorino designs and builds. You pay for the design and plans, then the build is a fixed price that rests on stated assumptions and allowances. |
Design-build is not a third price. It is how the work is delivered: design and construction under one company. It pairs with either price model, and either model also works with plans you bring.
What sits behind the price
Cost-plus
Why cost-plus
On a project this size, every detail cannot be priced up front, and cost-plus is the industry standard. Avorino is the general contractor and brings in licensed subcontractors trade by trade, in the right order: foundation, framing, electrical, plumbing and so on.
What the fee pays for
The fee is an agreed percentage of the cost of the work. It varies by project. It pays for:
- One point of contact.
- Finding and vetting subcontractors: references, licenses and insurance.
- Getting bids and negotiating them, then presenting the best options, or choosing for you if you prefer.
- Coordinating the trades so each one leaves the work ready for the next.
Peace of mind
Without a general contractor, trades can blame each other's work and costs grow. Avorino is the orchestrator who makes the pieces come together.
Fixed price
Allowances
Some line items carry an allowance, a set amount that can rise up to a stated limit when conditions on site call for it. Electrical is one example.
Assumptions
Without plans, the fixed price rests on stated assumptions. A space of that size usually needs a certain number of windows, and vinyl flooring is assumed. If you choose more or different, such as more windows or porcelain tile instead of vinyl, you pay the difference.
When plans are needed
Many remodels need no plans because nothing structural changes. Structural remodels do need plans.
Time
What sets how long a custom home takes?
Design, plan check, the conditions on your lot and construction each take time, and the total varies by lot and by city or county. Plan check time varies by department, and a coastal, planned-district, fire-zone or rural lot can add reviews and reports. We talk through the schedule for your lot in the consultation.
- 01Discovery + program
- 02Design coordination
- 03Pre-construction
- 04Vertical construction
- 05Finish work
- 06Walk + warranty
Licence and warranty
Licensed, with a tiered warranty.
Avorino is a licensed general building contractor, CSLB #1107538. Check our license on the CSLB website. (opens in a new tab)
Every Avorino build ships with a tiered construction warranty: 1-year fit & finish (paint, trim, mirrors, flooring, cabinets, countertops), 4-year systems (plumbing, electrical, HVAC), 10-year structural. Avorino takes the warranty call.
01 / Cost and time
How much does a custom home cost in San Diego?
The lot, the size and finish of the home, and what your city or county asks of the design set the cost. Avorino prices custom homes cost-plus: you pay the cost of the work plus an agreed fee, so the final cost can land above or below the estimate. We give a number after we have seen your lot and your plans.
How long does it take to build a custom home in San Diego?
It depends on the design, your city or county's plan check and permit time, the conditions on your lot and the size of the home. Coastal, planned-district, fire-zone and rural lots can add reviews and reports. We go over the schedule for your lot in the consultation.
02 / Permits and your lot
Do you handle permits?
Yes. For signed clients, Avorino submits the plans for plan check and coordinates structural engineering and Title 24 energy calculations. In the City of San Diego the plans go to the Development Services Department, and in unincorporated areas they go to the County's Planning and Development Services. A lot inside another city, such as Encinitas or Carlsbad, goes to that city.
Does a coastal lot need extra approval?
It can. In the Coastal Overlay Zone of the City of San Diego, a Coastal Development Permit is required for coastal development unless an exemption applies, and where the Coastal Height Limit Overlay Zone applies no building may exceed thirty feet. Some sites need a permit from the Coastal Commission instead. Ask the City about your lot, then bring us the address.
Can you help me before I buy a lot?
Yes. Bring us the address before you close, and we will review the lot with you. The city or county sets the requirements for the home you have in mind, and we go through them with you.
Do California's energy rules affect my home?
Yes. A permit application filed on or after January 1, 2026 follows the 2025 Energy Code, which encourages heat pumps and does not mandate a fuel type. Avorino coordinates the Title 24 energy calculations for your plans.
03 / Working with Avorino
Can I use my own architect or plans?
Yes. Avorino builds from a client's own plans, and when you do not have plans yet, our engineer and architect partners design the home with you.
What is the first step?
Book a free consultation. Tell us about your lot and what you want to build, and we will talk through scope, budget range and next steps.
Do you build in my area?
Avorino takes custom home projects across San Diego County, including La Jolla, Del Mar, Rancho Santa Fe, Solana Beach, Encinitas, Carlsbad, Point Loma, Coronado and North County. We are based in Tustin, in Orange County. Tell us your address in the consultation and we will confirm.
Talk to us
Start with a free 45-minute consultation.
Meet over Zoom, tell us about your lot and what you want to build, and we will talk through scope, budget range and next steps.

- 01Project
- 02Plans
- 03Context
- 04Contact
More custom home pages
Where Avorino is based, and where else we build.
Avorino is based in Tustin, in Orange County. These pages cover custom homes there and in Los Angeles County.